On November 16, Fujian GW-level Ningde Xiapu Energy Storage Power Station (Phase I) of State Grid Times successfully transmitted power. The project is mainly invested by State Grid Integrated Energy and CATL, which is the largest single grid-side standalone station-type electrochemical energy storage power station in China so far. The total investment of State Grid Times Fujian GW-level Ningde Xiapu energy storage project is 900 million RMB, with a total capacity of 200MW/400MWh after completion of the project, and the proposed energy storage station adopts the form of indoor arrangement. Among them, the construction scale of Phase I project is 100MW/200MWh.